How to change the shipment status with help of the PDA-screen.

  • The functionality to modify the shipment status with help of the PDA-screen can be found in: Backoffice -> Dispatch: left frame, click PDA-button.
  • Planners have the ability to edit the status of each job.
    • Select a node and click the pda-symbol in the right-top-corner of the planning board screen:


      (click to enlarge)

  • 1. You see the details of the job you have selected.
    Click report status.
  • 2. You see all dotcodes you have configured in Dot Codes.
    In this example we choose DNOK.
  • 3. You see an explanation about DNOK.
    You have the ability to type some extra text.
    Click OK.
  • 4. After some minutes you can see changes inside the planning screen.
    If dispatch colours are defined in Shipment Status screen you can notice a different colour of this particulair job/triangle.
    Inside the booking details (which you can view after clicking the specified triangle) you can notice a different status.
    Note: Before taking effect you propably have to refresh the planning screen (i.e. right mouseclick refresh/reload this frame).



-- RutgerRutgers - 28 Sep 2006

Topic attachments
I Attachment History Action Size Date Who Comment
GIFgif dispatch18.gif r1 manage 103.5 K 2006-04-20 - 09:29 RutgerRutgers PDA-screen
Topic revision: r1 - 2006-09-28 - RutgerRutgers
 
This site is powered by the TWiki collaboration platform Powered by PerlCopyright © 2008-2024 by the contributing authors. All material on this collaboration platform is the property of the contributing authors.
Ideas, requests, problems regarding TWiki? Send feedback